
Hamburg: the Freihafen Elbe Bridge closed to HGV traffic
In order to reduce the load on the Freihafen Elbe Bridge, the Hamburg Port Authority (HPA) has decided to introduce a weight limit. From 26 September, vehicles weighing more than 7.5 tonnes will no longer be allowed to cross the bridge.
The measure has been undertaken because of the current condition of the bridge structure, which is nearly 100 years old.
Diversion routes for vehicles weighing more than 7.5 tonnes run across the new Elbe Bridge, which can be reached via Veddeler Marktplatz and Zweibrückenstrasse.
Latest Posts
Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations
Unity Line has announced further cancellations of scheduled ferry sailings between Świnoujście and ports in Sweden (Trelleborg, Ystad) due to difficult...
Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor
The Mont Blanc Tunnel operator has scheduled maintenance works for March and April 2026, which will result in night-time traffic disruptions. The...
The Netherlands closes a tunnel on the route to Belgium
The Dutch infrastructure authority has scheduled a series of night closures of the Drechttunnel on the A16 motorway in 2026. The restrictions, related to...